Six-Sigma-Yellow-Belt-Training-II
Execute the analyze phase of the Six Sigma DMAIC project including the following:
- Identify necessary/unnecessary process steps
Execute the improve phase of the Six Sigma DMAIC project including the following:
- Modify the process to stay within an acceptable range
Execute the control phase of the Six Sigma DMAIC project including the following:
- Put tools in place to ensure that the key variables remain within the maximum acceptance ranges under the modified process.
Utilize all analytical tools available for Six Sigma as permitted or appropriate including, but not limited to: flowcharts, run charts, Pareto charts, checksheets, cause-and-effect diagrams, opportunity flow diagram, process control charts, failure mode and effect analysis (FMEA), design of experiments (DOE) and lean tools. Students can use templates located in the text or online sources.
Develop Microsoft® PowerPoint® presentation, including talking points, highlighting your work on the three phases of the Six Sigma process improvement project.